The Special Assessment Commission (SAC) ride and review will take place on Thursday, August 20 at 8:30 am. The ride involves physically reviewing the field of projects within the district area created. Those in attendance will include the Special Assessment Commissioners and special assessment staff. The Special Assessment Commission review (discussion on the benefits of the various projects) will be held in Engineering Conference Room E258 immediately following the SAC Ride. The Special Assessment Commission Hearing will take place on Wednesday, September 2 at 9 a.m. in the City Commission Chambers within Fargo City Hall (225 4th Street North).
The list of projects is as follows:
PROJ #
DESCRIPTION
LOCATION
AN-19-G
PC Concrete Alley Paving
Roberts Alley from 1-2 Av N
BN-17-B
San, WM, Storm, Grading, Pave, St Lights
19th Av N/57 St to I 29-Arterial
BN-18-F
San, WM, Storm, C/G, Paving, Grading
Madelyn's Meadows
BN-19-A
Paving, Storm, St Light, Signals, Shared Use Path, Sidewalk, Bridge, WM
52nd Av Arterial
BN-19-B
San, WM, Storm, Paving, Street Lights
Grayland Addition Phase II
BN-19-C
San, WM, Storm, Grading, C/G, Asphalt Paving
Golden Valley 2nd
BN-19-E
San, WM, Storm, Paving, Street Lights
Bison Meadows
BN-19-F
San, WM, Storm, Grading, C/G, Asphalt Paving
Eagle Valley 3
BN-19-J
San, WM, Storm, Paving, Street Lights
Fitzsimonds
BR-18-A
Paving, Storm, San, WM, SW,SL, Signals
Main Av from 2nd to Broadway (DOT)
BR-18-B
Paving, Storm, WM, San Lift, SW, signals
10th St N from 4-12 Av's (DOT)
BR-18-F
WM Replacement, Street Recon
Roberts Street
BR-18-G
WM Replacement, Street Recon
4 St S from 6 Av-2 St & on 6 Av from 4 St to 250' W
DN-18-A
Drain Improvements
Grayland/Drain 27 AREA
FM-14-84
Flood Mitigation, Street Recon
2nd St S
FM-17-C
Levee & Pond Project
Bison Meadows Addition
NN-15-B
Storm Lift station, retention & trunk storm
Commerce on 12th
NN-17-A
Storm Lift Station, Retention Pond
Laverne's Addition
NN-18-A
Storm Sewer Lift Station
Drain 27 area
NR-17-B
Broadway Interceptor Wet Weather Improve
Lift Station #1
NR-18-A
Storm Sewer Lift Station Modifications
#21 & #54
PN-18-B
Concrete Paving, C/G, Asphalt Paving
23 Av S/41st St area
PN-18-C
Concrete Paving
Laverne's Addition
PR-19-E
Seal coat
Sec 11,12 & 14 Assessed
PR-19-F
Mill & Overlay
8 sections
PR-19-G
Mill & Overlay
2 sections
SL-17-B
Street Lighting & Incidentals
Between 13th Av S/I-94 & University Dr/21 St S
SL-19-B
Street Lighting & Incidentals
19 to 29 Avs N between Broadway & Evergreen
SL-19-E
Street Lighting
7 & 8 St N from 15-17 Av
SN-19-A
New Construction of City Order Sidewalks
New Sidewalks
SR-19-A
Reconstruction of City Order Sidewalks
Recon Sidewalks
TN-19-A
Traffic Signal Improvements
University Dr & 17 Av N
UN-18-C
San, WM, Storm
Laverne's Addition