The Special Assessment Commission (SAC) ride and review will take place on Thursday, August 20 at 8:30 am. The ride involves physically reviewing the field of projects within the district area created. Those in attendance will include the Special Assessment Commissioners and special assessment staff. The Special Assessment Commission review (discussion on the benefits of the various projects) will be held in Engineering Conference Room E258 immediately following the SAC Ride. The Special Assessment Commission Hearing will take place on Wednesday, September 2 at 9 a.m. in the City Commission Chambers within Fargo City Hall (225 4th Street North).

The list of projects is as follows:

PROJ #

DESCRIPTION

LOCATION

AN-19-G

PC Concrete Alley Paving

Roberts Alley from 1-2 Av N

BN-17-B

San, WM, Storm, Grading, Pave, St Lights

19th Av N/57 St to I 29-Arterial

BN-18-F

San, WM, Storm, C/G, Paving, Grading

Madelyn's Meadows

BN-19-A

Paving, Storm, St Light, Signals, Shared Use Path, Sidewalk, Bridge, WM

52nd Av Arterial

BN-19-B

San, WM, Storm, Paving, Street Lights

Grayland Addition Phase II

BN-19-C

San, WM, Storm, Grading, C/G, Asphalt Paving

Golden Valley 2nd

BN-19-E

San, WM, Storm, Paving, Street Lights

Bison Meadows

BN-19-F

San, WM, Storm, Grading, C/G, Asphalt Paving

Eagle Valley 3

BN-19-J

San, WM, Storm, Paving, Street Lights

Fitzsimonds

BR-18-A

Paving, Storm, San, WM, SW,SL, Signals

Main Av from 2nd to Broadway (DOT)

BR-18-B

Paving, Storm, WM, San Lift, SW, signals

10th St N from 4-12 Av's (DOT)

BR-18-F

WM Replacement, Street Recon

Roberts Street

BR-18-G

WM Replacement, Street Recon

4 St S from 6 Av-2 St  &  on 6 Av from 4 St to 250' W

DN-18-A

Drain Improvements

Grayland/Drain 27 AREA

FM-14-84

Flood Mitigation, Street Recon

2nd St S

FM-17-C

Levee & Pond Project

Bison Meadows Addition

NN-15-B

Storm Lift station, retention &  trunk storm

Commerce on 12th

NN-17-A

Storm Lift Station, Retention Pond

Laverne's Addition

NN-18-A

Storm Sewer Lift Station

Drain 27 area

NR-17-B

Broadway Interceptor Wet Weather Improve

Lift Station #1

NR-18-A

Storm Sewer Lift Station Modifications

#21 & #54

PN-18-B

Concrete Paving, C/G, Asphalt Paving

23 Av S/41st St area

PN-18-C

Concrete Paving

Laverne's Addition

PR-19-E

Seal coat

Sec 11,12 & 14 Assessed

PR-19-F

Mill & Overlay

8 sections

PR-19-G

Mill & Overlay

2 sections

SL-17-B

Street Lighting & Incidentals

Between 13th Av S/I-94 &  University Dr/21 St S

SL-19-B

Street Lighting & Incidentals

19 to 29 Avs N between Broadway & Evergreen

SL-19-E

Street Lighting

7 & 8 St N from 15-17 Av

SN-19-A

New Construction of City Order Sidewalks

New Sidewalks

SR-19-A

Reconstruction of City Order Sidewalks

Recon Sidewalks

TN-19-A

Traffic Signal Improvements

University Dr & 17 Av N

UN-18-C

San, WM, Storm

Laverne's Addition